Canal Camp 2026-16 Cotswold Canals
Back

The Work: Rebuilding the Basin Wall at the bottom of John Robinson Lock. A good and interesting mix of restoration of original walls and construction of new walls using more modern techniques.

The Reason: John Robinson lock is the start point of the “Missing Mile” project – a key part of the Cotswold Canals restoration. Cotswold Canals Trust have been awarded £6.8 million pounds to complete this “Missing Mile” (which includes taking the navigation under the M5). Considerable work has been put in by both WRG and the Cotswold Canals Trust volunteers on the Lock Chamber and its upper section. This summer we hope to complete the lower part of the lock and its associated basin so that it is ready for the new channel.  

The Restoration: Cotswold Canals Trust aims to reopen the route from the Thames at Inglesham to the Gloucester & Sharpness Canal at Saul, with a phased approach. Phase 1a from Stonehouse to Brimscombe is largely complete; work is in hand on Phase 1b to re-connect this to the canal system at Saul. Phase 2 will restore the eastern end from Inglesham to the Cotswold Water Park, and significant restoration has taken place at key locations whenever funding has allowed. Finally, Phase 3 will tackle the difficult central section from the Water Park to Brimscombe.

Book now
Event Date(s)

Saturday 8th to Saturday 15th August

Cost

£90

Location

Stroud, Gloucestershire

Restoration

Canal Camp 2026-16 Cotswold Canals (John Robinson Lock Basin)

The Work: Rebuilding the Basin Wall at the bottom of John Robinson Lock. A good and interesting mix of restoration of original walls and construction of new walls using more modern techniques.

The Reason: John Robinson lock is the start point of the “Missing Mile” project – a key part of the Cotswold Canals restoration. Cotswold Canals Trust have been awarded £6.8 million pounds to complete this “Missing Mile” (which includes taking the navigation under the M5). Considerable work has been put in by both WRG and the Cotswold Canals Trust volunteers on the Lock Chamber and its upper section. This summer we hope to complete the lower part of the lock and its associated basin so that it is ready for the new channel.  

The Restoration: Cotswold Canals Trust aims to reopen the route from the Thames at Inglesham to the Gloucester & Sharpness Canal at Saul, with a phased approach. Phase 1a from Stonehouse to Brimscombe is largely complete; work is in hand on Phase 1b to re-connect this to the canal system at Saul. Phase 2 will restore the eastern end from Inglesham to the Cotswold Water Park, and significant restoration has taken place at key locations whenever funding has allowed. Finally, Phase 3 will tackle the difficult central section from the Water Park to Brimscombe.

View event location

Location

Stroud, Gloucestershire

PMXQ+59 Stonehouse, UK

Find directions to the Event

Events

Waterway underfunding

Hundreds of miles of waterways – along with their unique heritage and habitats – are currently starved of funding and rely on constant lobbying by us to safeguard their future.

Sustainable Boating

We want boating on canals and rivers to be more sustainable and – even though the current overall contribution to UK carbon emissions is very small – we want to help reduce emissions on the waterways.

Waterways Heritage at Risk

Britain’s canals and rivers are a unique, living heritage. But that heritage is at risk – from urban development, lack of protection, loss of skills and knowledge and climate change.

You can help Save Waterways Heritage.

Waterway restoration

Restoring the UK’s blue infrastructure – our inherited network of navigable canals and rivers – is good for people and places.