Cotswold Canals Camp (John Robinson Lock) CC2024-11

This event is currently full.
The work: Completing rebuilding of John Robinson Lock, following six successful weeks of Canal Camps in 2023. There are still brickwork repairs, coping stone reistatement, lock ladder installation and landscaping to be done - then there’s the nearby Dock Lock to work on.

 

The reason: These locks are part of the ‘Phase 1b’ length of the Stroudwater Navigation, which is being rebuilt and reopened from Saul Junction to Stonehouse, reconnecting the Cotswold Canals (the Stroudwater and the Thames & Severn Canal) to the national canal network. This work is being supported by a major grant from the National Lottery Heritage Fund. Our work represents an important contribution to the overall project, as well as counting as part of the necessary ‘match funding’ required by the Lottery grant.

The restoration: Cotswold Canals Trust aims to reopen the route from the Thames at Inglesham to the Gloucester & Sharpness Canal at Saul, with a phased approach. Phase 1a from Stonehouse to Brimscombe is largely complete; work is in hand on Phase 1b to re-connect this to the canal system at Saul. Phase 2 will restore the eastern end from Inglesham to the Cotswold Water Park (including Weymoor Bridge). Finally, Phase 3 will tackle the difficult central section from the Water Park to Brimscombe.

When
August 3rd, 2024 4:00 PM through August 10th, 2024 12:00 PM
Location
Cotswold Canals
Eastington, Gloucestershire
United Kingdom
Show large map
Contact
Phone: 01494 783 453 ext. 607
Phone: 01494 783 453 ext. 605
Event Fee(s)
Canal Camp 2024 Price Set £ 80.00